Energy Audit

  • June 1, 2023
Project Description

Logistics
Years: 2023
City: Nanjing, Jiangsu Province, China
Gross Floor Area (GFA): 99,505 sqm

Scope of the Mission: Energy Audit and Net Zero Pathway Calculations (CRREM)

More Information

Recommended energy conservation measures (ECMs) for the warehouse in Tianjin:

  • Indoor Lighting Renovation
  • Outdoor Lighting Control System
  • Split Air Conditioner Retrofit
  • VRF Centralized Control Retrofit
  • Gas Boilers Optimization
  • Variable Frequency Drive (VFD) for the Circulation Pumps
  • Solar PV
  • Smart Monitoring of Energy System
  • Faucet Aerator
  • Eco-friendly Awareness Initiatives

Estimated savings of 12,120 MWh with a payback period of less than 4.1 years.