Energy Audit

  • March 12, 2024
Project Description

Commercial
Years: 2024
City: Shanghai, China
Gross Floor Area (GFA): 36,000 sqm


Scope of the Mission: Energy Audit Level 1

More Information

Recommended energy conservation measures (ECMs):

  • Retrofit Variable Refrigerant Flow (VRF) piping Distribution System.
  • Install an Energy Monitoring System.
  • Relocate Temperature Controllers.
  • PAU De/Re-commissioning.
  • Recommissioning of the Lighting Control System: Configure the lighting control system to align with operational hours for each floor and space.
  • Water Heater: Discontinue hot water provision at public water points and consider installing smart plugs for energy conservation.
  • Lighting Parking Lot: Install a lighting controller, review and upgrade the lighting system, and replace low-quality LED tubes with high-quality alternatives (radar).