Energy Audit

  • January 1, 2023
Project Description

Commercial
Years: 2023
City: Xi’an, Shaanxi Province, China
Gross Floor Area (GFA): 143,700 sqm

Scope of the Mission: Energy Audit Level 2

More Information

Recommended Phase I (Focuses on achieving quick wins):

  • Chiller Setting Adaptation
  • Filter replacement
  • Occupancy sensor
  • Lighting Timer
  • Faucet Aerator

Recommended Phase II (Further ECM implementation for increased energy savings) :

  • Window Film For South Glazed Façade
  • Window Film For Skylight
  • Flue Gas Condenser
  • Variable Frequency Drivers(VFD) for Pumps
  • Optispeed Drive for Chillers
  • BMS Upgrade
  • VFD For Cooling Tower Fan

Recommended Phase III (Requires extensive engineering for a complete plant redesign) :

  • Rooftop solar PV
  • Free Cooling System
  • Heat Pump Heat Generator

Estimated energy savings of 11%, site carbon reduction of 19%, with a payback period between 1.2. and 7.3 years.